Project Q

Removal by hand of existing fibre glass pool lining. Structure was re-sprayed with concrete before finishing with tiles and hand trowelled marble.


© Copyright Rod Cameron Pools. Authorised Lic No. 48762 Lic. Under QBSA Act 1991.
Contact Us :: www.rodcameronpools.com.au